If multiple production files are linked to an engineering item, the synchronization must now be executed for each separate link. The data are no longer automatically synchronized to all linked production files of an engineering item at the same time. Also, you can choose to synchronize the engineering structure with just the linked production file itself, or with all underlying production files.
You can choose whether to copy part calculations, and if so, specify which part calculations are to be copied.