Situation 1
In the example below, a subproject line is linked to two calculation lines. One belongs to production file 1, and the other to production file 4.
If you calculate the items of this subproject, the following costs are added to the subproject:
Note: In this case there is no link to production file 3.
Situation 2
In the example below, a subproject line is linked to three calculation lines: one belonging to production file 1, one belonging to production file 3, and one belonging to production file 4.
If you calculate the items of this subproject, the following costs are added to the subproject:
Note: In this case there is no link to production file 3.
Situation 3
In the example below, a subproject line is linked to two calculation lines. One belongs to production file 1, and the other to production file 4. Production file 4 is an internal production file that is not otherwise linked to the other production files.
If you calculate the items of this subproject, the following costs are added to the subproject:
Note: In this case there is no link to production file 3.