Use the Engineering BOMs linked to production calculation for parts form to view and manage the links between the lines in the production calculation and the engineering BOM. This link is created automatically during the execution of the Synchronize engineering/production process. You can delete or add links, if required. For instance, you can delete any links that have been created unintentionally.