When operation calculation lines are backflushed, hour lines are created and processed. You can do so based on a preliminary or actual costing basis.When backflushing on an actual costing basis, the production receipts must have been posted, however. These lines are used to determine the hours worked. |
|
||
|
|||
5.5 * Labor/machine/overhead rate |
6.5 * Labor/machine/overhead rate |
|
|