Synchronize engineering/production

Run the Synchronize engineering/production process to synchronize an engineering item with the production file to which it is linked. It concerns the engineering item revision selected on the Engineering items form, where necessary including all underlying production files and/or memos, texts and documents.

The items copied and their copy destination depend on the settings in the Synchronize section of the Engineering items form.

You control the time of synchronization. For example, you could synchronize when the engineer has finished the design.

Conditions

Results

Memos, texts and documents are copied from:

Note: When creating a new engineering item revision, the engineering BOM and any links to a production file with a BOM are copied. Authorized lines are not copied, however. Instead of the authorized lines, new lines will be created the next time the synchronization is performed.

Fields

Settings

Status