Engineering BOM - part calculation

If configured, new or updated links are created between the engineering BOM and the part calculation during the synchronization of engineering items. Use the Engineering BOM - part calculation form to manage the links, for instance to delete an incorrect link or to manually create a link with an existing calculation.