Use the Synchronize engineering/part process to synchronize an engineering item with the part to which it is linked. It concerns the engineering item revision selected on the Engineering items form, including all underlying engineering item revisions and/or memos, texts and documents if desired.
The items copied and their copy destination depend on the settings in the Synchronize section of the Engineering items form.
You control the time of synchronization. For example, you could synchronize when the engineer has finished the design.
Conditions
In order to be able to synchronize an engineering item with a part, the following conditions must be true:
Results
If the part to which the item is to be linked does not exist, it is created automatically during the synchronization process. During synchronization, parts are automatically created based on an engineering item only if the value of the Part coding field on the Engineering form is 'Based on number table' or 'Equal to engineering item code'.
Memos, texts and documents are copied: