Using engineering item statuses

From now on you can use engineering item statuses to record the different phases of an engineering item.

You can assign an engineering item status to an engineering item. For each status you can indicate whether an engineering item with that status may be synchronized. A process allows you to update the status of multiple engineering items at the same time. Status changes are logged. If required, you can set a default value for the engineering item status. In the synchronization settings, you can specify the status to be assigned to an engineering item after a successful or failed synchronization.