Previous Topic

Next Topic

Inhoudsopgave

Book Index

Planning

The planning processes can be controlled in many ways. Some settings are configured once, after which they can no longer be changed without this having major consequences for the planning processes in Isah. Other settings are configured by capacity group, but can still be changed without any problems for individual processes in production files.

This Help topic discusses various settings that can be changed at a later stage, where these settings can be changed, and the different planning calculation methods.

General overview of the planning process

 

Actie

Alternatieven

(Re)schedule production file

Manual (re)scheduling on

Operations production calculation or

Operations planning board form

 

 

Check capacity

Check per capacity group on

Capacity group load form

 

 

 

Perform work

 

 

 

Register hours

 

 

 

 

Confirm operation

 

In this folder

Before you start planning

Considerations

Scheduling based on infinite capacity

Scheduling based on finite capacity