Subsequent operations

Use the Subsequent operations form to link the operation lines of the production file to each other and to define an operations sequence. This is relevant for the planning, amongst other things.

When specifying subsequent operations, you can:

Internal transport times and waiting times refer to the times in between two operations. This means that for the first operation and the last operation, the transport times must be entered differently. You can do so in two ways: